The Wilson Ave. realignment involves the rerouting of Wilson Ave. in Vallejo between Lighthouse and Hitchborn. Crews removed existing structures and processed the dirt along the waterfront for a stable subgrade for the new roadway. Underground crews installed new storm drain, sewer, and water lines for the new road relaignment. Surface engineering crews have the task of grading the roadway, sidewalk, and curb and gutter. Our paving crew will pave the road making it accessible for two–way traffic. This project is currently in progress.